Hongye Furniture Group Furniture for professional and residential projects
FREN
THE PROJECT NOTEBOOK

Guides and schedules for your project

Practical resources for comparing needs, specifications and services.

PROJECT GUIDE

The hotel furniture schedule

A space-by-space method for preparing a hotel or renovation furniture brief.

Explore ↗
PROJECT GUIDE

Your residential brief

Plans, references, rooms and materials for a useful first conversation.

Explore ↗
PROJECT GUIDE

Approving samples

Record the information connecting samples, drawings and the furniture order.

Explore ↗
PROJECT GUIDE

Comparing quotations

Review items, specifications and services before comparing totals.

Explore ↗
PROJECT GUIDE

Preparing an office brief

Use a layout brief to define workstations, meeting rooms, reception and storage.

Explore ↗
Phasing a hotel renovation
PROJECT GUIDE

Phasing a hotel renovation

A method for splitting a hotel renovation by space — guestrooms, reception and dining — and for setting out the stages and responsibilities to confirm.

Explore ↗
Guestroom furniture tiers
PROJECT GUIDE

Guestroom furniture tiers

Carcass, edge banding, runners, fabrics, foam, beds and hardware: how to read a hotel guestroom's tier and write it into measurable specifications.

Explore ↗
Calculating restaurant covers
PROJECT GUIDE

Calculating restaurant covers

Turning restaurant floor area into a cover count: deductions, table formats, aisle widths, service style and a zone-by-zone seating table.

Explore ↗
Lobby furniture planning
PROJECT GUIDE

Lobby furniture planning

Five zones, measured clear widths and fabrics chosen by use: how to furnish a hotel lobby without over-specifying the quiet corners or under-specifying the bar.

Explore ↗
Understanding the lobby quote
PROJECT GUIDE

Understanding the lobby quote

Furniture families, customization level, invisible specifications, packaging and services: what explains the gap between two hotel lobby furniture quotes.

Explore ↗
Specify the headboard wall
PROJECT GUIDE

Specify the headboard wall

Mounting heights for outlets and reading lights, bedside control, wall-protection finishes and plan-level coordination: the decisions that make a hotel headboard wall work from the first night of operation.

Explore ↗
Structuring an FF&E tender
PROJECT GUIDE

Structuring an FF&E tender

How to split a hotel FF&E brief into packages, set quantities by room type, fix finishes, write the mock-up clause, an evaluation grid and the exclusions to state before sending to suppliers.

Explore ↗
Mobilier de terrasse et pool deck
PROJECT GUIDE

Mobilier de terrasse et pool deck

Teak, black locust, powder-coated aluminium or woven resin: how to choose hotel terrace and pool furniture, fixings per substrate and glides that match the deck.

Explore ↗
Flexible seminar room furniture
PROJECT GUIDE

Flexible seminar room furniture

Density by layout, table dimensions and storage volume: how to turn one multipurpose room into theatre, classroom or work pods without losing seats.

Explore ↗
Buffet counter dimensions
PROJECT GUIDE

Buffet counter dimensions

Counter height, aisle width, station counts and hot holding: the dimensions that decide whether a hotel breakfast buffet still flows at 8 a.m.

Explore ↗
YOUR PROJECT STARTS HERE

Give your project a clear brief.

Plans, references and quantities: share what is already defined, and we will review the points to clarify.

Share your project ↗